Roof Completed Roof Completed Insulation Installed Insulation Installed Insulation Installed Insulation Installed Insulation Installed
The siding is on and the batten strips are going on. Hopefully the metal roofing will get installed over the next few days!
Siding on 03/13/2021 Siding on 03/13/2021 Siding & HVAC Installed 03/13/2021
Our Casita & Pavilion Lumber arrived! Our Casita & Pavilion Lumber arrived!
Our Power Pedestal was installed today! Our Power Pedestal was installed today!
The following Pictures are from the concrete pouring on January 30, 2021. The pour was for our RV Parking pad, Casita, Covered Pavilion & Uncovered Pavilion.
Concrete Pour Jan 30, 2021